Shanghai Junko New Energy Technology Co.,Ltd.
Shanghai Junko New Energy Technology Co.,Ltd.

Induction Heating Equipment Maintenance - Cooling Water System Inspection Considerations

Table of Content [Hide]

    Check the water pressure


    The water pressure should be between 0.5mpa—1.0mpa. Regular maintenance is essential, especially for systems sourced from a professional induction heating equipment factory to ensure long-term stable performance.


    Adjust the water pressure switch


    Turn the screw in the middle of the water pressure switch to adjust the water pressure to 0.4KgL/cm.


    Check the water flow direction: designate blue water and red water


    Main color


    Blue represents water, red represents water


    Transformer


    Left for inlet, right for outlet.


    Induction coil


    Pay special attention to the direction of water inlet and outlet. Leading manufacturers like junko company limited emphasize correct coil flow design to maximize cooling efficiency.


    Check the water quality


    The water quality should be clean, pollution-free, and free of debris on the surface.

    References